Dismantling Projects
Polypropylene Plant, 75,000 T/Y in 2001-2002, Japan Mizoshima Industrial Zone
Polypropylene Plant, 175,000 T/Y
Construction Projects
SABA Steel-making Project , 1999-2000 , Esfahan , Iran
Equipment Installation of Danieli 2000 Roller for Esfahan Steel Co.:
Wagon Tippler Machine
Bag Filter
Electrical Arc Furnace(EAF)
Vacuum-Oxygen-Decarburization (VOD)
Ladle Furnance (LF)
Polypropylene Plant Construction, 2003-2004, Bandar Imam Free Zone, Iran
Installation & Startup of a Full Automatic Industrial Greenhouse with 35000 m3 Area in Esfahan, Iran
The Most Engineering Activities with 320000 man/h:
- Installation of Steel Structure with Glass Covering (650 m × 48 m × 6 m)
- Piping Execution (70 km)
- Installation of Electrical & Instrumentation Elements (60 km Cabling)
- Installation & Startup of Steam Production, RO Water, CO2 Production and Water Treatment
- Installation & Startup of Fogging System
- Installation & Startup of Control System
- Installation & Startup of Packing System
Basic & Detail Design of Feed Pipeline and Feed & Product Storage
Tanks in Assaluyeh, Iran
The Most Engineering Activities:
• Design of Three Spherical Storage Tank with 25 m Diameter for Propane Reserving
• Design of Two Spherical Storage Tank with 15 m & 20 m Diameter for Propylene Reserving
• Design of an Atmospheric Full Containment Storage Tank with 34000 m3 Capacity for
Propylene Export
• Design of Propane Refrigeration Unit
• Design of Ethylene Storage Unit (Loading & Unloading)
• Design of 1-Butene Storage Unit (Loading & Unloading)
• Design of Truck Loading Unit for Propylene Transportation