Experinces

Implemented Projects by Main Personnel

1- Detail Design, Procurement, Installation & Startup of Regal Petrochemical in MahShahr, Iran (150000 t/y PP Production)

Responsibilities of PSNP Personnel were:
    • Supervision on Design, Construction & Installation of Three Spherical Storage Tanks with 20 m Diameter
    • Engineering Manager (Detail Engineering, Procurement & Startup)
    • Executive Manager (Equipment Installation & Startup)
    • Civil Manager (Design & Supervision on Execution)
    • Process Senior (Design & Startup)
    • Instrumentation Senior
    • Electrical Senior (Design & Installation)
    • Piping Engineer
    • Commercial Manager
  • Maintenance Manager

2- Detail Design, Installation & Execution of Mobin Petrochemical Wastewater Treatment Unit in Assaluyeh, Iran

Responsibilities of PSNE Personnel were:

  • Engineering Manager (Detail Engineering, Procurement & Startup)
  • Work Shop Manager (Equipment Installation, Execution & Startup)
  • Civil Manager (Design & Supervision on Execution)
  • Process Manager (Design & Startup)
  • Instrumentation Senior
  • Electrical Senior (Design & Installation)
  • Piping Engineer
  • Commercial Manager

3- Installation of Mobin Petrochemical Incinerator in Assaluyeh, Iran

  • Equipment Installation
  • Commissioning & Startup

4- Basic & Detail Design of a Emulsion Polymerization Unit for Sazaco Co., Esfahan, Iran

  • Basic & Detail Design
  • Supervision on Installation & Execution
  • Supervision on Startup

5- Equipment Installation of Danieli 2000 Roller for Esfahan Steel Co., Esfahan, Iran

  • Wagon Inverter
  • Bag Filter
  • Electrical Arc Furnace
  • Caldron Furnace
Implemented Projects by PSNE

1- Basic & Detail Design of Feed Pipeline and Feed & Product Storage Tanks for MEPEC Petrochemical in Assaluyeh, Iran (PDH & PP Plant)

The Most Engineering Activities:
  • Design of Three Spherical Storage Tank with 25 m Diameter for Propane Reserving
  • Design of Two Spherical Storage Tank with 15 m & 20 m Diameter for Propylene Reserving
  • Design of an Atmospheric Full Containment Storage Tank with 34000 m3 Capacity for Propylene Export
  • Design of Propane Refrigeration Unit
  • Design of Ethylene Storage Unit (Loading & Unloading)
  • Design of 1-Butene Storage Unit (Loading & Unloading)
  • Design of Truck Loading Unit for Propylene Transportation

2- Installation & Startup of a Full Automatic Industrial Greenhouse with 35000 m3 Area in Esfahan, Iran

The Most Engineering Activities with 320000 man/h:

  • Installation of Steel Structure with Glass Covering (650 m × 48 m × 6 m)
  • Piping Execution (70 km)
  • Installation of Electrical & Instrumentation Elements (60 km Cabling)
  • Installation & Startup of Steam Production, RO Water, CO2 Production and Water Treatment
  • Installation & Startup of Fogging System
  • Installation & Startup of Control System
  • Installation & Startup of Packing System